Digital-IT Good practice guides
The project will publish two good practice guides on the project website and deposit them in an open access repository for longer-term access for stakeholders.
![](/sites/default/files/styles/text_paragraph/public/2023-03/euramet-digital-it_3.png.webp)
Two good practice guides will be published, targeted at IEC TCs, digital substation instrument manufacturers, DSOs and TSOs.
- Good practice guide on calibration of commercial SV enabled instrumentation with up sampling rate up to 96 kSPS.
- Good practice guide for calibration of substation instrumentation using PTP timing.