Erik Weihs Forsknings- och utvecklingsingenjör Tel +46 10 516 62 69 Email erik.weihs@ri.se Location Göteborg Ask me about Ask me about Project Cyberrisks caused by a flexible electricity market... In the future energy system, much electricity generation, flexible energy products and storage may be connected to the internet, making them vulnerable to cyber attacks. In this project, RISE and High Voltage Valley study cyber ri… Project Nordic Early Warning Early Prevention System Reseach project with the objective to develop and demonstrate methods for monitoring and contorl of the Nordic Power System. The project is conducted as a Swedish-Norwegian collaboration, under the lead of the Transmission System … Project ANM4L - Active Network Management For All Alternatives to traditional network expansion are needed to ensure sustainable development of the power grids. New technologies, methods, and markets are emerging to provide increased flexibility in consumption, generation, and po… Expertise Power system analysis The power system is in a transition phase, where the integration of intermittent renewable electricity generation alters the system dynamic and increases the strain on the transmission and distribution grids.