Contact person
Thorbjörn Gustavsson
Gruppchef
Contact ThorbjörnUsed to create moisture-proof constructions and to stop emissions from reaching the indoor environment. We work on evaluating the function of these constructions in connection with damage investigations, inspections and quality assurance during new installation, verification of system solutions in connection with certification and follow-ups.
The purpose of a function control can be, for example, inventory / function mapping of installations or follow-up control of certified systems to assess the system's function. Function testing can also be a subset of damage investigation of buildings with moisture problems.
The functional test of the mechanically ventilated design ensures that the system works in the intended way and that moisture and emissions from underlying construction do not spread to the indoor environment.
A functional test can be performed at different stages:
The accredited SP methods 1630-1634 cover a range of test methods for evaluating the function in mechanically ventilated gaps, which include, for example, control of airflow direction, pressure difference between the ventilated gap and the indoor environment, airtightness and tracer gas measurement to study air movements.
In addition to these measurements, an indication measurement of the airflow in the exhaust air duct and pressure drop over the building envelope is normally included. When monitoring the certified systems, an assessment is also made of the installed system's compliance with the design documentation.
Results from the functional test are presented in a report.