Skip to main content
Search
Menu
Bild

Cellulose fibres: Pilot plant for stock preparation

Flexible pilot plant for stock preparation for cellulose fibres, an important step in paper production.

Here, fractionation is done with strainers and hydrocyclones in single-stage systems or more complex multi-stage systems. There are also refiners for refinering the pulp that can be plugged into the desired positions. All equipment is on an industrial scale. The prepared pulp can be used in pilot paper machines. There is also a lab for pulp and paper testing.

The testbed consists of:

  • Pressure screens with strainer baskets with different hole sizes.
  • Hydrocyclone rigs with different numbers of barrels. 
  • Mills with different refinery segments. 
  • Pumps, pulp tanks and measuring and control equipment. 
  • Piping systems and flexible hoses for connecting the units to complete stock preparation systems.

The units are portable and can easily be connected in different combinations to test different stock preparation strategies.

Facts

Test & Demo name

Pilot plant for stock preparation

Established

2010

Category

Isolated testbeds (IT)

Industry

Materials, Process industry, Pulp, paper and packaging

Area

Bioeconomy, Packaging, Climate neutral industry, Chemical processes and products, Pulp and paper, Material transition, Production and manufacturing, Water

Region

Region Stockholm

Elisabeth Björk

Contact person

Elisabeth Björk

Forskare

+46 76 876 72 08

Read more about Elisabeth

Contact Elisabeth
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

* Mandatory By submitting the form, RISE will process your personal data.