Skip to main content
Search
Menu
Swedish clay
Photo: Foton från Fyleverkens övergivna täkt i Eriksdal

Activated clays in future binders for a sustainable concrete infrastructure

Supplementary cementitious materials (SCM) are utilized for manufacturing concrete with lower environmental footprint. This is while the availability of existing SCMs is going to be limited in near future. Clay-Bind project is concentrated on assessing the potentials of using Swedish clays as SCMs.

The production of “green” infrastructures made of concrete goes generally through the use of supplementary cementitious materials (SCMs), which decreases the carbon dioxide footprint due to reducing the Portland cement content needed for production of the concrete. However, limitations on the availability of the major SCMs such as slag or fly ash are expected in the near future. Moreover, some common SCMs like silica fume or metakaolin are not only being expensive but can also not be used in large proportions because it would affect negatively the early properties of fresh concrete.

Those limitations brought a lot of attention to clays during the recent years. Clays have not been used in their full potential as cement constituents due to an ample supply of other SCM in the past. It is known that these materials exhibit pozzolanic properties when activated (by e.g. calcination) and can react with the calcium hydroxide of the cement. The energy consumption and CO2 emissions during calcination of clays are lower than in the cement production. Therefore, the substitution of a fraction of Portland cement by calcined clays will improve the sustainability of a blended binder.

To account for the potentials of the use of Swedish clay resources, a three-step project is suggested. Step I will focus on optimizing the activation process of the different clays. In step II, the reactivity and pozzolanic activity of the clays in cement systems will be studied. Finally, step III, the possibility of application of activated clay in existing Concretes used for infrastructures will be investigated.

Summary

Project name

ClayBind

Status

Active

RISE role in project

Koordinator

Project start

Duration

2 år

Total budget

1,000,000 SEK

Partner

https://www.cementa.se/sv

Funders

https://www.vinnova.se/

Supports the UN sustainability goals

9. Industry, innovation and infrastructure
Gilles Plusquellec

Contact person

Gilles Plusquellec

Forskare

Read more about Gilles

Contact Gilles
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

* Mandatory By submitting the form, RISE will process your personal data.